October 08, 2018 - ADVERTISEMENT FOR BIDDER’S PROOF OF RESPONSIBILITY
LINCOLN COUNTY SANITARY LANDFILL
MERRILL, WISCONSIN
OCTOBER 8, 2018
  « Back

Department: Solid Waste / Landfill

ADVERTISEMENT FOR BIDDER’S PROOF OF RESPONSIBILITY
Lincoln County Sanitary Landfill
Merrill, Wisconsin
October 8, 2018

The Lincoln County Solid Waste Department, Merrill, WI will accept completed Bidder’s Proof of Responsibility forms for construction projects to be performed in 2019, 2020, and 2021 at the Lincoln County Sanitary Landfill (LCSL), Merrill, WI.

The completion of the Statement of Bidder’s Proof of Responsibility form is required prior to submitting a bid for future construction work at the LCSL. Project bids submitted for new construction projects without previous submittal of the Bidder’s Proof of Responsibility Form and notification of successful standing will be rejected from consideration.

The type of work to be performed generally consists of the following:
  • Clearing and grubbing.
  • Landfill subbase excavation.
  • Landfill clay borrow excavation and transportation.
  • Landfill subbase grade stabilization.
  • Landfill compacted clay liner construction.
  • Landfill geosynthetic clay liner (GCL) installation.
  • Landfill geomembrane installation.
  • Landfill leachate collection/management system.
  • Manhole construction.
  • Landfill select granular fill installation.
  • Landfill piping and submersible pump installation.
  • Sedimentation basin/outlet structure construction.
  • Electrical resistivity testing for landfill construction.
  • Support of electrical resistivity testing subcontractor for landfill construction.
  • Landfill gas management system (extraction wells, header & lateral piping, blower, condensate management features)
  • Installation of erosion stormwater control products for landfill construction.
  • Waste excavation.
  • Soil excavation and hauling.
The Bidder’s Proof of Responsibility Form may be obtained by accessing the Lincoln County, WI website at: www.co.lincoln.wi.us/departments/forms_and_documents/?department=31a394cd7f14 and by selecting the Bidder’s Proof of Responsibility item. Overnight mailing of form to prospective bidders will not be provided.

The completed form and supporting information are required to be submitted to Lincoln County Information Technology at mailto:dmiller@co.lincoln.wi.us (in PDF format only) no later than November 9, 2018 at 5:00 p.m. C.S.T.

After the forms have been received, the Lincoln County will acknowledge the receipt of the information, review the completed forms, and notify the applicants via email of their status with either a successful or non-successful standing. A reference number will be included with the notification for insertion on the bid forms for construction projects in 2019, 2020, and 2021.

Published by the authority of:
Lincoln County Solid Waste Department
Dan Miller
Lincoln County Solid Waste Manager
Dated at Lincoln County, Wisconsin
October 8, 2018
Request for Proposal - Vertical Baler https://t.co/LzSmvTn4GN
Legal Notice  |  Privacy Notice  |  Acceptable Use Policy  |  Linking Policy
Copyright © 2018 Lincoln County Government - Merrill Wisconsin
Designed & Powered By   DMI Studios